Supply platform
1 setSupplies panels to labeling; confirm the lift-platform interface.

iGC-GL-1T2
An overhead gantry handling unit distributes labeled panels to two nesting machines. Roller transfer and unloading stations connect the main operations.
IGOLDENCNC
A genuine machine demonstration will be placed here.
iGC-GL-1T2
An overhead gantry handling unit distributes labeled panels to two nesting machines. Roller transfer and unloading stations connect the main operations.
Discuss material, workpiece dimensions and required operations with our team before confirming the configuration.

Supplies panels to labeling; confirm the lift-platform interface.
Receives label data and labels each panel.
Picks labeled panels and distributes them to receiving stations.
Receive and buffer panels; the rollers are not powered.
Run the assigned programs to nest each panel.
Receive machined panels for subsequent transfer.
Coordinates label data, panel allocation, buffering and machining programs.
Steps 04–06 form two corresponding machining routes. Passive rollers receive and buffer panels; the final loading motion is confirmed with the agreed layout.
Allocate labeled panels to two machining routes through a shared gantry.
Receiving stations provide a waiting position while the paired machine finishes its current job.
Central control distributes label information and the corresponding machine programs.

The raised labeler prepares panel identification before gantry handling. Storage capacity depends on panel thickness and the agreed loading arrangement.

The gantry gripper distributes panels between two receiving stations according to the line sequence.

Each CNC machine receives its own machining program and passes finished panels to its paired unloading platform.
| Handling arrangement | Two-axis overhead gantry with vacuum gripper |
|---|---|
| Nesting machines | 2 machines with 2 unloading platforms |
| Receiving stations | 2 passive roller groups |
| Working area per CNC | 1300 × 2500 × 250 mm; customization to confirm |
| Gantry beam length | 10.2 m; not the overall line footprint |
| Gripper capacity | 8 suction cups; maximum 100 kg subject to panel and gripping conditions |
SERVICE & SUPPORT
Discuss materials, processes and sample-testing needs before selecting the configuration.
Ask about the operating guidance and training available for your selected equipment.
Contact the team with the model, issue description and part requirements for support.
IGOLDENCNC
Tell us your material, dimensions and process requirements to discuss the appropriate configuration.
Submit an inquiry ↗